The RO scheme (Renewables Obligation) is now closed to all new generating capacity since 31 March 2017. Any additional capacity installed must be separate from your current system with a separate generation meter. Any installed additional capacity will be able to claim for export units only. If you add additional panels, please advise us by emailing [email protected] or calling us on 028 9068 5010.